Romania
Overview
Integrated solar platform with co-located battery storage, positioned to benefit from Romania’s renewable expansion and increasing system flexibility needs.
62.8 MW photovaltaic plant complemented by a 20MW / 80 MWh BESS system, located in the Dobrogea region, one of Romania’s areas with the highest solar irradiation potential.
RTB July 2026
28.3MWp
8.94MW / 35.10MWh
0.9km
RTB July 2026
28.3MWp
11.29MW / 45.13MWh
2.2km